New Implementations

INTEGRATED DESIGN DETAILING

A structural approach that dramatically increases efficiency

Integrated design detailing is a methodology that accelerates construction by developing detailed fabrication 3D models when the structure is being designed Structural Engineer. This approach yields saving on costs and reduction on schedules.

A typical project worked under integrated design detailing can be completed at 30% to 40% of the time it would be required under traditional detailing that starts after the fabrication contract has been awarded.

The engineering company that holds the design contract deals directly with us. We start working when design is about 50% in this way it is possible to have accurate material reports and detailed erection drawings at the bidding stage.

When the fabricator is selected, we customize drawings to the fabricator standards and release a custom fabrication package

Integrated Design Detailing brings benefits for the overall project

  • Cost Savings
  • Improvements on Schedules
  • Accurate fabrication quotes
  • Accurate construction quotes

Integrated Design Detailing delivers benefits for project stakeholders

OWNERS

  • Anticipated revenue generation as the building can be built sooner
  • More accurate quotes from contractors, as quotes are based on actual material reports and erection drawings
  • Significant improvements on project schedule.
  • Gratings and floor plates layouts with Shop drawings.

ENGINEERS

  • Steel RFIs are managed and resolved during design phase
  • Control of the detailing Contract
  • Significant improvements on project schedule.
  • No delays resolving issues when the design drawings have been released to fabricators.

CONTRACTORS

  • Improvement in quotes accuracy due to complete information regarding materials
  • Other disciplines can use the model to accommodate mechanical, electrical and plumbing components
  • Improvements on schedules results in lower costs

STEEL FABRICATORS

  • Quotes can be more accurate and competitive as they are based on actual constructible model and bill of materials
  • It is no necessary to manage RFIs for detailing
  • Fabrication can start after 5 days the contract is awarded, faster delivery means more business